Product Description
Model Number ABC
Insulation Material XLPE
Type Low Voltage
Application Industrial
Conductor Material Aluminum
Jacket No
Model Number abc cable
Conductor Material Aluminum
Application Industrial
Type low voltage
Jacket PE,PVC,XLPE
Standard BS IEC ASTM DIN
Product Feature
1.U0/U :0.6/1kV,up to 12kV
2.Standard : ASTM B-230,B-231,B-232 and B-339. ICEA S-76-474. IEC60502, NF C33-209, GB 12527-90
3.conductor:copper / Aluminum stranded conductor
4.insulation: XLPE / PE
5.conductors: stranded copper conductor or AAC / AAA
6.Cross section area:16~240mm2
7.Direction of lay:Right hand Z
8.Color:black or as per requirement
9.Certification:ISO9001, ISO14001,OHSMS18001,CCC,etc.
10.OEM can be available
Product Specification / Models
Operating Characteristics:
*The long time working temperature of cable should not be highter than 90 u00b0C .
*While insulation the ambient temperature should not be lower than -20 u00b0C
*Max.temperature at short circuit (the longest continuous time is not more than 5S) XLPE insulation is 250 u00b0C
*The continuous time of test in 1 min . the cable should be no breakdown
*Partial discharge test: implementing AC Voltage 9kV on insulation shield cable
Application / Models
Operating Characteristics:
*The long time working temperature of cable should not be highter than 90 u00b0C .
*While insulation the ambient temperature should not be lower than -20 u00b0C
*Max.temperature at short circuit (the longest continuous time is not more than 5S) XLPE insulation is 250 u00b0C
*The continuous time of test in 1 min . the cable should be no breakdown
*Partial discharge test: implementing AC Voltage 9kV on insulation shield cable
Other Information
Our Services1. We guarantee to offer new advanced goods.
2. We'd like to send skilled personnel to the installing place to help offer technical consultant, quantity estimation and instruction,
installing, preliminary testing,and help start up running; and to answer for any defect of the product found in installing and run testing,
If there's something wrong with the product, we'll give our answer within 12 hours and get to the spot within 36 hours.
3.After installaton, We'll send skilled personnel to have the preliminary test and answer for any problems emerged. We take the whole charge of the fee needed in repairing,testing or retesting within the scope of our duty required in contract.
4.During the contract's period of validity,of the project must be started all over again or the goods can not be used at all which is resulted from
our faulty goods and improper files or mistakes made by our instructors, we'll change the goods at once without compensation and
take charge in all expenses of reinstallation.
8.Notice:we can produce the product according to customer's requirment.
Short delivery time and quotation at once.