Technical data :
Main Electric Motor:3 kw | |
Working Pressure:1.5-3.0 MPa | |
Voltage:380V,50Hz,3Phase | |
Output:150L/h | |
Max. aggregate size:3 mm | |
Cement/Sand:≥ 0.35 | |
Weight: 180kg | |
Dimension: 900*600*1600mm |
Application Places :
Concrete buildings, railway tunnels, highway Bridges, culverts, urban subway, hydropower station, the dam slope harbor engineering such as crack, construction joint, expansion joint grouting waterproof and anchor grouting, the grouting solidarity, backfill grouting and curtain grouting, soft rock reinforcement, honeycomb structure, soil cement grouting or composite grouting engineering, etc.
Building wall waterproof coating, cement mortar spraying, dry powder mortar spraying, powder spraying, coating putty, really stone paint spraying, rockery, sculpture handicraft coating engineering etc.
Necessary Construction Conditions :
Water and electricity should be provided on site.
The construction place should be safe, covered and smoothed.
Machine and materials should avoid exposing in damp place.
Tightly connect the deliver hose, air hose, water hose and power line.
SG-2 cement mortar spraying machine with rich experience in the field of cement-based grouting, adopting R-WRT Screw pump core, have increased the stable performance of single-phase electric power unit. Its superior mechanical performance, reliability, better value, higher construction efficiency, greatly improve the efficiency of grouting
SG-2 cement grouting machine is designed for spraying cement grouting field and r & d and manufacturing of professional models, the fuselage lightweight, wide use, scientific structure simple, do not need special training to operate construction or maintenance, its revolutionary r-wrt patented coating screw pump core technology, not only can effectively avoid the difficulties and lack of perfusion slurry compared with the traditional mechanical grouting construction is more effective.
1.Plugging engineering applications
Water leakage of expansion joint, subway, tunnels, mine plugging, leak-proof projects, dams & other flood water leakage plugging projects.
2.Structure reinforcement projection applications crack
Reinforcement, bridge reinforcement, floor reinforcement.
3.Coating project materials:
cement painting& pu coating for wall ,roof,and ceiling
Attention:
The construction place must wear protective equipment (such as gloves, masks, goggles, safety helmet).
Before construction, please pour a moderate amount of washing powder or detergent into the hopper, then switched on 1-3 minutes, make the pipe better wetting unobstructed with good mobility. Pure water is not allowed, in order to protect the core will not rust and can start smoothly next time.
While the machine is working, the electric box must be closed and locked, to prevent dust and moisture intrusion, and the damage of machine components.
Before work and after, often check the reducer and the bearing seat must refuel.
Moving the machine in the construction place, regardless of what distance, must pull out the power line first.
After construction should be clean the machine and pipe in time, the electric box can only be brushed try, do not wash.
When used as a sprayer, subject to equipped with 0.25-0.36 cm3 / min of air compressor and the special sprayer gun give you a satisfied reply in 12 hours.
No information