All Categories 


|
Model
|
Plastic handle
|
|
Product material
|
New PE/PP/100% food grade
|
|
Handle diameter
|
various
|
|
Handle length
|
various
|
|
Color
|
Customized
|
|
Logo
|
Customized by mould or cap pad printing machine
|
|
Application
|
Fill Water juice soda cosmetic etc
|
|
Min.order quantity
|
100,000pcs
|
|
Package
|
580*460*430mm/ 6500pcs/carton
|
| Product Name | Lateral Handle mould |
| Core &Cavity Steel | 2316#steel, S136, H13, 718, SKD61, P20, S50C, 45#steel, 4Cr13, |
| 3Cr13, BeCu or based on customer's requirement. | |
| Mould base & Standard Component | DME,HASCO,MISUMI,LKM,Self-made etc. |
| Steel hardness: | HRC30-35 for base material. |
| HRC45-48 for core and cavity material. | |
| HRC60-62 for special parts material | |
| Plastic material | PP,,PE,HDPE etc. |
| Cavity Number | 1*4, 1*6, 1*8,1*12, 1*16, 1*24, |
| Injection System | Pin gate, Submarine gate, Valve gate etc |
| Ejector System | stripper plate, ejector sleeve, ejector pin |
| Cycle Time | Based on cap design |
| Tooling lead time | 30-60 Days |
| Mould life | At least 1.5million Shots |
| Quality assurance | ISO9001:2008/ CE certificate for European customers |
| Handle Mold Feature |
| 1. Adopt imported steel P20, Germany 2316, S136 etc. |
| 2. Each cavity and core have independent cooling system, with independent parts for replacement |
| 3. Rational mold design to extend mold life and get high production efficiency. |
| 4. Mirror hand polishing and mold plates chroming to create added-value. |
| 5. Precision Machining to ensure high production efficiency & fine parting line effect. |
| 6. Skilled Language in communication and experienced in international standard. |
| 7. Hot runner system: China advanced brand or imported hot runner system brand. |
| Each cavity has independent temperature control and heater system. |
| Lateral Handle mould | |
| 1.R&D | We support customer R&D. Make the files or improve the design if you needed. |
| 2.Quotation Making | Mould Quotation will be finished in 1 day according to information we get. |
| 3.Negotiation | The quality, price, material, delivery time, payment item, etc. |
| 4.Mould Design | 1-2days for product 3D/2D drawing design as per customer's design or our company's design. Then in further make the mould 2D/3D design. |
| 5.Mould | 1. confirm the proucts and the mold design |
| 2. Mould material prepare | |
| 3. Rough machining(heat treatment on mold base and pre-harden on mold) | |
| 4. CNC/ Vacuum Hardening on mold main spare parts | |
| 5. finishing machining( JDPAINT, DEM.etc) | |
| 6. Dimension inspection | |
| 7. Ejector& runner& cooling & other device process | |
| 8. Assemble mold | |
| 6.Mould Testing | When moulds are finished, we will test the mould and we will send samples for consumer reference. |
| 7. Sample confirmation | If the first sample is not satisfied by customer when it is come out. We modify the mould and until meet customer’s satisfaction. |
| 8.Delivery | Delivery goods by sea or by air, according to customer’s requirement. |
Inquiry Basket ( 0 )
( 0 )
No information